Meter Assembly, Disassembly and Commissioning and Control

In all our project work, a pre-installation survey is conducted, and initially, meter sizing and cabling application is planned. Afterward, the installation process begins. Once on-site heat performance and leak tests are completed, the commissioning process is finalized.

QMET provides installation services for heat and water meters not only in new projects but also in cases of meter replacement in existing buildings. In replacement projects in existing buildings, disassembly is carried out first, followed by the installation of new meters by expert technical teams, and the project is then handed over.